Winner – Municipal Facility

Wisconsin Rapids Recreation Complex

Location: Wisconsin Rapids
Owner:
City of Wisconsin Rapids
Concrete Supplier: County Materials Corporation
Contractor: Miron Construction Co., Inc.
Contractor: COST of Wisconsin, Inc.
Contractor: Chippewa Concrete Services
Contractor: Pool Works Inc.
Contractor: Tri-City Concrete Contractors Inc.
Architect/Engineer: MSA Professional Services
Aquatic Designer: Water Technology, Inc.

The aquatics center consists of over 95% ready-mix concrete.  1,550 cubic yards was used to form three pools, a lazy river, the floors, and walls of the pumphouse, mechanical room, and water storage tank.

The pools and lazy river were created using a 5000-psi mix. Because of the project’s tight one-year timeline, crews worked through the winter, installing temporary shelters, allowing shotcrete to be applied in inclement weather.   Integral color was incorporated into the design with the use of deep blues and subtle greys on the interior floors.

Specialized design skill is demonstrated by the tight radiuses of the lazy river and the decorative ready-mix rocks stained with several earth-tone colors to emulate rocks found in natural rapids, tying together the overall theme.  A variety of ready-mix applications, techniques, and colors came together to form a unique nature-themed waterpark for families to enjoy for years to come.